SEDA-COG Joint Rail Authority
Skip navigation links
.: HOME :.
.: SEARCH :.
Skip navigation links
Doing Business with JRA
Policies and Procedures
Rails-with-Trails Standards
Additional Contacts
Rail Facility Improvements
Environmental Management
JRA Bid Solicitation
JRA Bid Results
Railroad Links
JRA In The News
Home
About the JRA
JRA Board and Staff Information
Board Meeting Minutes
JRA System
JRA History
JRA Right to Know
Seminars & Conferences
Central PA Rail Freight Summit
2020 Passenger Excursions Time Table
Visit SEDA-COG
JRA Bid Solicitations
 

 JRA Bid Solicitations

 
Use SHIFT+ENTER to open the menu (new window).
  
  
Body
  
collapse Status : Open ‎(55)
  

​The SEDA COG Joint Rail Authority (JRA) is seeking bids from qualified contractors for replacement of Bridge No. 195.88 on the North Shore Railroad in Cooper Township, Montour County and Montour Township, Columbia County, Pennsylvania. The replacement project involves removing the existing stone masonry arch bridge and installing a new precast concrete box culvert and end sections, necessary track improvements, erosion and sedimentation pollution control, and channel improvements.

The Sealed Bids will be received by Mr. Jeffery Stover, Executive Director, SEDA-COG Joint Rail Authority, 201 Furnace Road, Lewisburg, Pennsylvania 17837 until 3:00 P.M. local prevailing time on May 11, 2021. The bids will be publicly opened and read aloud. Proposals shall be on the forms required, sealed and clearly marked NORTH SHORE RAILROAD BRIDGE 195.88 REPLACEMENT PROJECT” and submitted at the SEDA COG Joint Rail Authority Office, 201 Furnace Road, Lewisburg, PA 17837. Bids that are faxed or emailed cannot be accepted.


InvitationForBids.pdfInvitationForBids.pdf

4/13/2021
  

​The SEDA-COG Joint Rail Authority (JRA) is seeking to sell a railroad crane and miscellaneous scrap. This information is presented for information only – the bidder must determine, in the field, the scrap’s condition and quantities.

All rail and other track material on the site is to be removed and stockpiled at a location identified by the JRA, none of which is being sold.

A PREBID meeting will be held on site on April 7, 2021 at 10:00 a.m. The site is located at the railroad crossing at North Derry Avenue approximately ¼ mile north of the intersection of East Mill Street and North Derry Avenue in the Borough of Burnham, PA.


Bids due by 2:00 p.m. – April 13, 2021

To: SEDA-COG Joint Rail Authority
201 Furnace Road
Lewisburg, PA 17837
570-524-4491
Fax: 570-524-9190
Email: kpostupack@seda-cog.org​


Bid Solicitation_North_Yard-Burnham_03292021.pdfBid Solicitation_North_Yard-Burnham_03292021.pdf

4/1/2021
  

​The SEDA COG Joint Rail Authority (JRA) is seeking bids from qualified contractors for rehabilitation of Bridge No. 33.84 on the Nittany and Bald Eagle Railroad in Boggs Township, Centre County, Pennsylvania. The rehabilitation project involves raising the profile over Bridges 33.84 and 33.97 as shown. The existing ballast will be removed from Bridge 33.84 and concrete deck rehabilitated at each pier with precast concrete deck segments. The bridge will be raised to eliminate the steel brackets and walkway that currently support ballast by jacking and providing new steel grillage pedestals. Bridge 33.97 will receive a new timber tie deck and new grillage pedestals to raise bridge to proposed profile. NBER Bridge 20.67 bearings will also be repaired with reinforced concrete as part of this project.


The Sealed Bids will be received by Mr. Jeffery Stover, Executive Director, SEDA-COG Joint Rail Authority, 201 Furnace Road, Lewisburg, Pennsylvania 17837 until 3:00 P.M. local prevailing time on March 9, 2021. The bids will be publicly opened and read aloud. Proposals shall be on the forms required, sealed and clearly marked NITTANY AND BALD EAGLE RAILROAD BRIDGE 33.84 REHABILITATION PROJECT” and submitted at the SEDA COG Joint Rail Authority Office, 201 Furnace Road, Lewisburg, PA 17837. Bids that are faxed or emailed cannot be accepted.​

Bridge33.84_Advertisement.pdfBridge33.84_Advertisement.pdf



2/4/2021
  

​The  SEDA-COG  Joint  Rail  Authority  is  soliciting  bids  from  qualified  general contractors to remove and replace seventeen (17) windows within the Office Building and two (2) doors in the Warehouse located at 421 Reighard Avenue (corner of Boyd and Reighard, adjacent to GeneralCable) in the Newberry section of Williamsport, PA.  A pre-bid meeting at the site is scheduled for Tuesday, December 1 , 2020 at 10:00 a.m.  Attendance at the pre-bid meeting is  mandatory.  

The general scope of work includes removing and replacing all windows in the Office Building with at least one sliding window in each room and replacing two doors in the Warehouse.   The replacement windows should be commercial grade, aluminum framed windows. 

Each  bid  shall  be  accompanied  by  a  warranty  describing  the  time  period  and  compensation  related to warranties provided by the material supplier and/or installation contractor. 

The bids must be received at the office of the SEDA-COG Joint Rail Authority, 201 Furnace Road, Lewisburg, PA 17837, by 3:00 p.m. on Tuesday, December 8, 2020.  Bids must be accompanied by a 5% bid bond or certified check in the same amount.  Unsuccessful bidders will have their checks returned immediately.  Bids will be awarded on Wednesday, December 9, 2020.The work must be completed by February 12, 2021. 

Should  you  have  any  questions,  please notify  me  directly  by  phone  at  (570)  713-4172  or  at  kpostupack@seda-cog.org.​


Bid Solicitation - Windows and Doors - LVRR Building - November 2020.pdfBid Solicitation - Windows and Doors - LVRR Building - November 2020.pdf​



11/20/2020
  

The SEDA-COG Joint Rail Authority is soliciting bids from qualified electrical contractors to remove and replace all electrical structure within the Warehouse Building located at 421 Reighard Avenue (corner of Boyd and Reighard, adjacent to General Cable) in the Newberry section of Williamsport, PA. A pre-bid meeting at the site is scheduled for Wednesday, October 28, 2020 at 10:00 a.m. Attendance at the pre-bid meeting is mandatory.

Bid Solicitation Electrical Removement and Replacement_LVRR Office Warehouse.pdfBid Solicitation Electrical Removement and Replacement_LVRR Office Warehouse.pdf

10/20/2020
Attachment
  

​The SED A-COG Joint Rail Authority will receive sealed bids for Contract No. NBER 2020-04: South High Street Grade Crossing Renewal on the SEDA-COG Joint Rail Authority's Nittany and Bald Eagle Railroad until 3:00 PM prevailing time, Wednesday, September 30, 2020 at the office of Mr. Jeffery Stover, Director, SEDA-COG Joint Rail Authority, 201 Furnace Road, Lewisburg, P A 17837. All bids will be publicly opened and read aloud at that time.

9/10/2020
Attachment
  
The SEDA-COG JRA is soliciting bids to remove and repair the roof, scuppers, and rain gutters on the railroad office building and warehouse located at 421 Reighard Avenue in the Newberry section of Williamsport.  See attached document for further details.
7/15/2020
Attachment
  
The work included in this project consists of reconstructing the grade crossings at Commerce Park in Williamsport, Canfields Lane in Montoursville, and Schoolhouse Road grade crossing in Linden, PA on the Lycoming Valley Railroad.
1/16/2020
Attachment
  
Contract No. BLOOM 2019-03: Grade Crossing Renewal Project on the SEDA-COG Joint Rail Authority's North Shore Railroad
 
Bloom 2019-03 Grade Crossing Renewal Project - Addendum 1
 
12/23/2019
Attachment
  
Contract No. SVRR 2019-07 for State Route 54 Grade Crossing Renewal on the Shamokin Valley Railroad.
12/16/2019
Attachment
  
Attached is a Request for Proposals (RFP) for Banking and Financial Services issued by the SEDA-COG Joint Rail Authority.  All the details are in the attached document.
10/2/2019
Attachment
  
Instructions to Bidders
Agreement
Map
7/1/2019
Attachment
  
Replacement of three reinforced concrete pipes on the
Nittany & Bald Eagle Railroad (NBER) Milepost 30.53 in Boggs Township, Centre County, PA.
 
Addendum No. 1 for the Nittany & Bald Eagle Railroad Bridge No. 30.53 Replacement Project
 
Addendum No. 2 for the NBER Bridge 30.53 Replacement Project
 
Addendum No. 3 for the NBER Bridge 30.53 Replacement Project
 
Procedures for the Installation Adjustment, Maintenance, and Inspection of CWR
4/9/2019
Attachment
  
4/1/2019
Attachment
  
2/13/2019
Attachment
  
Repairs to impacted areas to the Shop Track along Buffalo Run on the Nittany & Bald Eagle Railroad, Bellefonte Branch, Centre County, PA
4/3/2018
Attachment
  
Addendum #1
3/23/2018
Attachment
  
3/21/2018
Attachment
  
3/21/2018
Attachment
  
3/21/2018
Attachment
  
Bid Schedule - Revision 1
3/21/2018
Attachment
  
2/27/2018
Attachment
  
Contract No. WPB 2-17-04: Industrial Track Rehabilitation
JVRR West Park Branch Addendum No. 1
JVRR West Park Branch Addendum No. 2
JVRR West Park Branch Addendum No. 3
1/15/2018
Attachment
  
1/4/2018
Attachment
  
6/20/2017
Attachment
  
Addendum No. 3
3/6/2017
Attachment
  
Addendum No. 5
2/20/2017
Attachment
  
Addendum No. 2
2/20/2017
Attachment
  
1/27/2017
Attachment
  
1/20/2017
1 - 30Next